The Maguga Dam Project

Komati Basin Water Authority (KOBWA)

The Components of the Development


The Project was divided up into eight tasks:

MDC-1 - Permanent Access Roads to the Dam and Relocation of the Bridge and Adjusted Portion of MR-1 Road

MDC-2 - Infrastructure of the Housing Area

MDC-3 - Town Planning & Architectural Service related to Permanent Housing

MDC-4 - Design and Supervision of Construction: Main Civil Works and Associated Hydraulic Steelworks

MDC-5 - Design and Supervision of Construction: Power House Electro-Mechanical Works, Transformer, Switching Yard and Transmission Lines

MDC-6 - Reservoir Environmental Impact Assessment and Instream Flow Requirements

MDC-7 - Resettlement Planning

MDC-8 - Host Area Infrastructure

Further Details

Further details of the project can be obtained from:

The Komati Basin Water Authority (KOBWA)
Suite 1010 The Pinnacle
1 Parkin Street
PO Box 5085
Nelspruit 1200
Republic of South Africa
 
Tel +27 1311 23 191
Fax +27 1311 24 704
Email kobwanpt@cis.co.za

 

The Swaziland Komati Project Enterprise (SKPE)
4th Floor Dhlan'ubeka House
Cnr. Tin & Walker Streets
Mbabane
Swaziland
 
Tel +268 404 7950
Fax +268 404 7954
Email: komatpcu@realnet.co.sz
Website: www.ecs.co.sz/komati/

Back to the Top

The information provided above does NOT in any way represent the OFFICIAL opinion or views of KOBWA or the Swaziland Government about the Maguga Dam Project

This page was last updated on 05 November 2001


Background


The Project


Social and Environmental Responsibility


The Components of the Development


The Komati River Bridge


The Maguga Dam


Access Roads


Resettlement and Compensation


The Piggs Peak Bulk Water Supply


The Maguga Dam Clinic


The Glen Housing Village


The Multi-purpose Hall


The Piggs Peak Club